At Unleash we care deeply about code quality. Technical debt creeps up over time and slowly builds to the point where it really starts to hurt. At that point it's too late. Feature flags that have outlived their feature and are not cleaned up represent technical debt that you should remove from your code.
Stale and potentially stale toggles
When a flag is no longer useful, we say that it has become stale. A stale flag is a flag that has served its purpose and that you should remove from the code base. For a flag to become stale, you have to explicitly mark it as such. You can mark a flag as stale in the technical debt dashboard.
Unleash also has a concept of potentially stale flags. These are flags that have lived longer than what Unleash expects them to based on their feature flag type. However, Unleash can't know for sure whether a flag is actually stale or not, so it's up to you to make the decision on whether to mark it as stale or to keep it as an active flag.
A flag being (potentially) stale, does not affect how it performs in your application; it's only there to make it easier for you to manage your flags.
The technical debt dashboard
In order to assist with removing unused feature flags, Unleash provides project health dashboards for each project. The health dashboard is listed as one of a project's tabs.
The dashboard includes a health report card, and a list of flags that can be filtered on different parameters.
Report card
The report card includes some statistics of your application. It lists the overall amount of your active flags, the overall amount of stale flags, and lastly, the flags that Unleash believes should be stale. This calculation is performed on the basis of flag types:
- Release - Used to enable trunk-based development for teams practicing Continuous Delivery. Expected lifetime 40 days
- Experiment - Used to perform multivariate or A/B testing. Expected lifetime 40 days
- Operational - Used to control operational aspects of the system's behavior. Expected lifetime 7 days
- Kill switch - Used to to gracefully degrade system functionality. (permanent)
- Permission - Used to change the features or product experience that certain users receive. (permanent)
If your flag exceeds the expected lifetime of its flag type it will be marked as potentially stale.
One thing to note is that the report card and corresponding list are showing stats related to the currently selected project. If you have more than one project, you will be provided with a project selector in order to swap between the projects.
Health rating
Unleash calculates a project's health rating based on the project's total number of active flags and how many of those active flags are stale or potentially stale. When you archive a flag, it no longer counts towards your project's health rating.
The health rating updates once every hour, so there may be some lag if you have recently added, removed, or changed the status of a flag.
Flag list
The flag list gives an overview over all of your flags and their status. In this list you can sort the flags by their name, last seen, created, expired, status and report. This will allow you to quickly get an overview over which flags may be worth deprecating and removing from the code.